DfMA architects in London and the UK

Design for Manufacture and Assembly (DfMA) is a way of designing buildings so they are simpler to make in a factory and quicker to put together on site. It combines design for manufacture, which reduces complexity in the parts, with design for assembly, which reduces the time and cost of putting them together.

We design to the RIBA DfMA Overlay. DfMA is at the heart of our modular hotels and housing, and of our own patented MMC system, Strukturea.

The benefits of DfMA

  • Shorter construction programmes
  • Less waste and a lower carbon footprint
  • Safer sites, with fewer hazardous activities on site
  • Fewer workers needed on site
  • Easier quality control before components reach site

DfMA principles we apply

  • Minimise variation: fewer module types, simpler ordering and production.
  • Keep parts simple: avoid unnecessary features that complicate manufacture.
  • Respect tolerances: design within what the factory can achieve.
  • Make assembly obvious: components that can only go together one way.
  • Design out adjustments: fewer fixes needed on site.

DfMA in our projects

  • YOTEL Gatwick: rooms designed around a central services pod that forms the bathroom and brings the main services together, with interlocking bed modules around it.
  • citizenM Tower of London: a 400-room modular hotel, adapting an existing consent to the modular system.
  • Unilife, Winchester: MMC adviser on the MMC strategy and factory system for Stelling Properties’ student accommodation roll-out.
  • Room2: MMC adviser and interior designer for the hometel brand’s UK and European roll-out.
  • Strukturea: our own patented plug-and-play volumetric system.

For hotels in particular, see hotel architects in London and MMC hotel design.

DfMA FAQs

What is the difference between DfMA and MMC?

MMC (modern methods of construction) describes how a building is made, such as modules or panels. DfMA is the design approach that makes those methods work well, by simplifying parts and making assembly quick and predictable.

Does DfMA limit the design?

It sets rules, such as fewer room types and consistent grids, but it need not limit quality. Buildings such as citizenM Tower of London show modular design working on sensitive sites.

At what stage should DfMA start?

From the first feasibility drawings. The RIBA DfMA Overlay sets out what to consider at each stage of the RIBA Plan of Work.

Read more

Talk to us about DfMA on your project: use the form below or call 020 4526 8965.