DFMA
Design for Manufacture and Assembly (DfMA) is a way of designing buildings so they are simpler to make in a factory and quicker to put together on site. It combines design for manufacture, which reduces complexity in the parts, with design for assembly, which reduces the time and cost of putting them together.
We design to the RIBA DfMA Overlay. DfMA is at the heart of our modular hotels and housing, and of our own patented MMC system, Strukturea.
For hotels in particular, see hotel architects in London and MMC hotel design.
MMC (modern methods of construction) describes how a building is made, such as modules or panels. DfMA is the design approach that makes those methods work well, by simplifying parts and making assembly quick and predictable.
It sets rules, such as fewer room types and consistent grids, but it need not limit quality. Buildings such as citizenM Tower of London show modular design working on sensitive sites.
From the first feasibility drawings. The RIBA DfMA Overlay sets out what to consider at each stage of the RIBA Plan of Work.
Talk to us about DfMA on your project: use the form below or call 020 4526 8965.