Having been granted planning permission for an MMC scheme for 111 units in Golder Green, we aimed to build on the success and framework agreement created for spectrum, so designed a scheme with the same modules.
After creating the framework agreement with suppliers, we agreed rates to allow us to get the planning phase started with a secure cost structure.
The scheme was designed as a modularisation of existing permission, changing the mix and increasing the amount of units.
It aims to break down the structure into a series of blocks that respond to various aspects on site. The elevation was specifically designed to be fully created in the factory.